All CollectionsPlan and complete inspectionsSchedule inspectionsCreate and manage SchedulesCreate and manage SchedulesChoose a Schedule type, set up work and maintain Schedules through the season.By Logan1 author·10 articlesPrepare to schedule a ChecklistPrepare a Checklist, a target and an assignee before creating a Schedule, and check who can configure it.Choose a Schedule typeCompare Calendar Schedules, Continuous Schedules and Ad Hoc Slots by timing, missed work, readiness and repeat use.Schedule a ChecklistPublish a Checklist to the mobile app with a Calendar Schedule, Continuous Schedule or Ad Hoc Slot, including Patterns, Specifics and Exclusions.Prevent missed ChecklistsReview Schedule settings and early alerts to reduce missed Checklists, and understand when missing work is excluded from tracking.Schedule rotating equipment inspectionsPlan a two-week or four-week equipment rotation using separate Calendar Schedules and dated Specific slots.Schedule an inspection that runs overnightUse a Specific slot with separate start and end dates for work that crosses midnight.Set up an on-demand request formUse a Continuous Checklist and Assignment Trigger to let a team submit structured requests whenever work is needed.Arrange cover for Checklist reviewersGive a backup reviewer the Schedule access and notifications needed to cover an absence, then remove temporary access deliberately.Prepare Schedules for a new seasonReview recurring work, shared Calendars, closures and Location opening hours before the next operating season begins.Pause, end or delete a ScheduleChoose between an Exclusion, an expiration date, removing targets or deleting, and see exactly what deleting a Schedule or Ad Hoc Slot does.